INSP-Final Inspection | 12/12/2014 | 12/12/2014 | 12/12/2014 | P | PASS |
Troy Cobbley
|
|
|
permit finaled and underground flush passed
|
INSP-Sprinkler Rough-in/Hydro | 12/11/2014 | 12/11/2014 | 12/11/2014 | P | PASS |
Troy Cobbley
|
|
|
Underground hydro test for the east building passed
|
INSP-Sprinkler Rough-in/Hydro | 12/10/2014 | 12/10/2014 | 12/11/2014 | P | PART |
Troy Cobbley
|
|
|
The east building underground hydro failed. The west building underground hydro passed.
|
INSP-Sprinkler Rough-in | 10/22/2014 | 10/22/2014 | 10/22/2014 | P | PART |
Forrest France
|
|
|
Okay to cover IBR and stub to the 1st 90 at the west building as marked and dated on approved plan set.
|
INSP-Sprinkler Rough-in | 10/8/2014 | 10/8/2014 | 10/8/2014 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for location of one of the two in building risers that has been installed and is ok to cover
|