INSP-Final Inspection | 3/31/2015 | 4/1/2015 | 4/1/2015 | P | PASS |
Forrest France
|
|
|
Previously noted items finished. Permit final approved.
|
INSP-Final Inspection | 3/3/2015 | 3/4/2015 | 3/4/2015 | A | PART |
Forrest France
|
|
|
Final pending remainder of elevator installation and associated control equipment. Duct detectors, smoke at panel, batteries, and power supply tested okay. Need to provide signage at the door to the FACP room, record of completion documents at final.
|