Permit Information
Permit NumberFIR14-00778
StatusFinaled
Name PHOENIX FIRE PROTECTION
Site Address 5301 E WARM SPRINGS AVE
Project NameTerraces of Boise EFG Dry
Customer Number 
ePlanReviewYes
Description
The fire sprinkler scope of work consists of protecting wings E, F & G. The attic in wing F is protected with concealed space sprinklers. The remainder of the attic is protected, with attic sprinkler and standard upright sprinklers.

The Terraces of Boise - Main Building Wings F and G - To construct a new 72,340 square foot, four story, wood framed independent living apartment building. This is a wing of a larger building, with building wings separated by two-hour firewalls. This building is being constructed on top of an underground parking garage. The parking garage is separated from the above apartment building by a three-hour horizontal separation. This building is fully fire sprinklered. The sprinklers are used for area and height increases. First Floor: 20,000 sq. ft. with 16 apartments and a design center. Second Floor: 21,000 sq. ft. with 15 apartments and a media area. Third Floor: 17,475 sq. ft. with 13 apartments and a small theater. Fourth Floor: 13,865 sq. ft. with 8 apartments units. All floors contain mechanical/electrical and housekeeping areas. Wings F and G will constructed as part of Phase II
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/14/201510/15/201510/15/2015APASS
DetailsThomas Walsh
Final Inspection passed. Certificates of Completion forms to be submitted electronically.
INSP-Final Inspection10/6/201510/6/201510/6/2015PPART
DetailsThomas Walsh
Trip test of dry-pipe system protecting the attic spaces above wings E, F & G. The system failed its test yesterday, so the contractor installed an accelerator to improve its activation. Retest passed - water delivered within 60 seconds.
INSP-Sprinkler Rough-in/Hydro10/2/201510/2/201510/4/2015PPASS
DetailsThomas Walsh
Completed 24 hour air test of dry pipe system for wings E, F & G - PASSED
NOTE: Hydrotest of all wet pipe and dry systems for these wings have been completed. Fire alarm interface testing required prior to final acceptance.
INSP-Sprinkler Rough-in/Hydro9/30/201510/1/201510/1/2015PPART
DetailsThomas Walsh
Bldg EFG dry pipe system air test (start)
42 psi @ 1300 hrs.
INSP-Sprinkler Rough-in/Hydro9/25/20159/28/20159/28/2015PPART
DetailsJim Page
200 psi hdrostatic test complete on dry system, 24 hour air test still needs to be completed.
INSP-Sprinkler Rough-in/Hydro4/9/20154/10/20154/10/2015APART
DetailsForrest France
Verified plan modifications. Dry system area G upper and lower levels plan sheet 3 okayed for cover.
INSP-Sprinkler Rough-in3/19/20153/20/20153/20/2015AFAIL
DetailsForrest France
Area G dry system install does not correlate with approved plan set regarding main routing.
INSP-Sprinkler Rough-in3/19/20153/19/20153/19/2015PCANC
DetailsForrest France
3rd floor rough to cover
Please call Leroy 30 min prior ###-#### Phone #: ###-#### >> Inspection requested via web by Jacci Hunt Inspection cancelled from web by: Jacci Hunt
INSP-Sprinkler Rough-in3/2/20153/3/20153/6/2015PPART
DetailsForrest France
INSP-Sprinkler Rough-in12/30/20141/2/20151/2/2015APART
DetailsForrest France
Completed rough-in inspection for the dry system area E third floor. Noted one missing seismic brace. A portion of framing/blocking at eaves to remain open to ensure adequate coverage.
INSP-Sprinkler Rough-in12/30/201412/31/201412/31/2014PDEFR
DetailsForrest France