Permit Information
Permit NumberFIR14-00792
StatusFinaled
Name PHOENIX FIRE PROTECTION
Site Address 5301 E WARM SPRINGS AVE
Project NameTerraces of Boise Bldg H
Customer Number 
ePlanReviewYes
Description
[Terraces of Boise Bldg H]
The fire sprinkler scope of work consists of protecting wings H. Extended coverage sprinklers and standard sprinklers are being utilized. The attic for building H will be under a separate submittal.

The Terraces of Boise - Main Building Wing H - To construct a new 66,075 square foot, four story, concrete and steel framed assisted living and memory care and commons building. This is a wing of a larger building, with wings separated by two-hour fire walls. This building is fully fire sprinklered. The sprinklers are used for area increase. First Floor: 7,090 sq. ft. consisting of Commons areas. The commons area contains administrative offices and employee back of house areas. Second Floor: 25,155 sq. ft. with 24 memory care apartments and a dining/living area, kitchen, family room and activity areas. Third Floor: 16,915 sq. ft. with 20 assisted living apartments with a 4,280 sq. ft. occupied landscaped roof area. Fourth Floor: 16,915 sq. ft. with 20 assisted living apartments. All floors contain mechanical/electrical and housekeeping areas. The first and second floor commons areas, on the east side of Wing H, will be constructed as part of Phase I and the memory care and assisted living portion of Wing H will be constructed as part of Phase II. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/28/201512/28/201512/28/2015PPASS
DetailsJim Page
Tampers and flow switches tested for 2nd and 3rd floor, devices tested okay and were put into service.
INSP-Final Inspection12/23/201512/28/201512/28/2015ACANC
DetailsJim Page
Called POC listed for project, Raul phone# ###-####, POC is on vacation out of the country, this inspection request is cancelled and the contractor will need to reschedule inspection request.
INSP-Final Inspection12/23/201512/28/201512/23/2015ACANC
DetailsJim Page
TOB bldg. H final
Please call Leroy 30 min prior Phone #: ###-#### >> Inspection requested via web by Jacci Hunt Inspection cancelled from web by: Jacci Hunt
INSP-Final Inspection12/17/201512/17/201512/17/2015PCANC
DetailsJim Page
Contractor will reschedule to coincide with alarm inspection.
INSP-Sprinkler Rough-in/Hydro11/6/201511/6/201511/6/2015PPASS
DetailsJim Page
200 psi hydrostatic test passed/complete for bldg H basement level, 1st floor, 2nd floor and 3rd floor.
INSP-Sprinkler Rough-in10/26/201510/27/201510/27/2015PPART
DetailsThomas Walsh
Rough to cover inspection for Bldg. H 3rd floor drop ceiling lids. PASSED
NOTE: This completes the rough inspection for the entire 3rd fllor.
OK to cover pipe on thi floor.
INSP-Sprinkler Rough-in10/14/201510/15/201510/15/2015APART
DetailsThomas Walsh
Rough to cover inspection of second floor drop ceiling drops. All areas inspected OK - see plans for areas inspected - This inspection completes rough insp. for the second floor - hydrotest and final inspections to be performed at a later date.
INSP-Sprinkler Rough-in9/21/20159/22/20159/22/2015PPART
DetailsThomas Walsh
Rough to cover inspection for Bldg. H 1st floor - drop tile areas only. PASSED
NOTE: All hard lids for this floor already inspected, therefore rough inspection for this entire floor is completed.
INSP-Sprinkler Rough-in9/14/20159/14/20159/14/2015PPART
DetailsThomas Walsh
Rough to cover inspection for Bldg. H basement. See plans for areas inspected this visit.
NOTE: Two (2) SSU sprinklers located at the elevator lobby obstructed by grid mounted lighting units that exceeds 4ft in one dimension. Modify these sprinklers as needed, or remove the obstructions to these sprinklers.
INSP-Sprinkler Rough-in8/17/20158/18/20158/18/2015APART
DetailsThomas Walsh
Rough to cover inspection for hard lid areas on the 3rd floor of Bldg. H. See plans for areas inspected this visit. OK to cover pipe in these areas.
INSP-Sprinkler Rough-in8/7/20158/10/20158/10/2015APART
DetailsThomas Walsh
Re-inspection of fire caulking of 3rd floor Bldg. H - RTC inspection. All penetrations adequately fire caulked. OK to cover pipe in this area - see plans for areas (rooms) inspected.
INSP-Sprinkler Rough-in8/7/20158/7/20158/7/2015PFAIL
DetailsThomas Walsh
RTC inspection for Bldg. H 3rd floor hard lids. Conversation about fire-caulking transpired. Called Jim Storey to confirm requirements. Jim stated that fire cauling required for all wall penetrations between the rooms and the corridor, as well as the walls separating the unit rooms. Therefore, more caulking is required, as many of the walls separating units were not fire caulked. Will reschedule when completed.
INSP-Sprinkler Rough-in8/7/20158/7/20158/7/2015PCANC
DetailsThomas Walsh
TOB Bldg H wet RTC
Please call Leroy 30 min prior ###-#### Phone #: ###-#### >> Inspection requested via web by Jacci Hunt Inspection cancelled from web by: Jacci Hunt
INSP-Sprinkler Rough-in8/3/20158/4/20158/4/2015APART
DetailsThomas Walsh
RTC inspection for hard lid areas for the 2nd floor - Bldg H. See plans for areas inspected.
OK to cover piping inspected today.
INSP-Sprinkler Rough-in7/22/20157/23/20157/23/2015APART
DetailsJim Page
RTC inspection for Bldg H 2nd floor hard lid areas - see plans for areas inspected today.
OK to cover pipe in these areas.
INSP-Sprinkler Rough-in/Hydro7/21/20157/21/20157/21/2015PPART
DetailsThomas Walsh
RTC inspection for Bldg H basement and first floor hard lid areas - see plans for areas inspected today.
OK to cover pipe in these areas.
INSP-Sprinkler Rough-in7/14/20157/14/20157/14/2015PPART
DetailsThomas Walsh
Rough to cover inspection for Bldg H wet pipe system for 3rd floor (2nd floor above grade) for units only - see plans for areas inspected today.
OK to cover these areas.
INSP-Sprinkler Rough-in6/26/20156/26/20156/26/2015PPART
DetailsThomas Walsh
RTC inspection for Bldg H wet system for first and second floors - hard lid areas - see plans for areas inspected. Also Bldg H first floor feed main provides protection for the bulk feed main that supplies wings A-D, that are completed and in service.
INSP-Sprinkler Rough-in6/17/20156/17/20156/18/2015PPART
DetailsThomas Walsh
Rough to cover inspection for 1st floor Bldg. H hard lid areas - see plans for areas inspected.
INSP-Sprinkler Rough-in6/5/20156/8/20156/8/2015APART
DetailsThomas Walsh
Hard lid rough inspection for Bldg. H wet pipe system - see plans for areas inspected.
OK to cover these areas.
INSP-Sprinkler Rough-in/Hydro6/1/20156/1/20156/1/2015PPART
DetailsThomas Walsh
Hydrotest (partial) of Bldg H basement and first floor portions of the system needed for TCO of Bldgs A-D Phase 1 TCO.
200psi @ 2 hours - PASSED
INSP-Sprinkler Rough-in5/21/20155/21/20155/21/2015PPART
DetailsThomas Walsh
Rough in inspection of Bldg. H -basement hard lid areas.
INSP-Supply line flush2/13/20152/13/20152/13/2015PCANC
DetailsForrest France
Please call Leroy 30 mins prior Phone #: ###-#### >> Inspection requested via web by Jacci Hunt Inspection cancelled from web by: Jacci Hunt