INSP-Final Inspection | 9/2/2015 | 9/2/2015 | 9/2/2015 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 8/27/2015 | 8/28/2015 | 8/28/2015 | A | FAIL |
Troy Cobbley
|
|
|
Not all of the hvac units functioned and still need to test the flow switch.
|
INSP-Final Inspection | 8/25/2015 | 8/25/2015 | 8/25/2015 | P | FAIL |
Troy Cobbley
|
|
|
See the city approved plans for corrections needed which include as-builts, add notification, test hvac units, relocated manual pull station and repair strobe.
|
INSP-Alarm Testing | 5/26/2015 | 5/26/2015 | 5/26/2015 | P | CANC |
Troy Cobbley
|
|
|
Call prior to going Phone #: 2089411846 >> Inspection requested via mobile web by Brian Inspection cancelled via mobile web on Tuesday, May 26, 2015.
|
INSP-Alarm Testing | 5/21/2015 | 5/26/2015 | 5/26/2015 | A | CANC |
Troy Cobbley
|
|
|
As early as possible Phone #: 2089411846 >> Inspection requested via mobile web by Brian Anderson Inspection cancelled via mobile web on Tuesday, May 26, 2015.
|