INSP-Final Inspection | 3/23/2015 | 3/23/2015 | 3/23/2015 | P | PASS |
Forrest France
|
|
|
Verified added coverage at the14th and 15th floor common area closets. Fire sprinkler permit finaled.
|
INSP-Final Inspection | 3/13/2015 | 3/16/2015 | 3/16/2015 | A | PART |
Forrest France
|
|
|
Noted existing electrical panel closets adjacent to the service elevator on the 14th and 15th floors lacking fire sprinkler coverage. (This activity was added in error so we have changed the case status back to Issued.) (This activity was added in error so we have changed the case status back to Issued.)
|
INSP-Sprinkler Rough-in | 2/18/2015 | 2/18/2015 | 2/18/2015 | A | PART |
Forrest France
|
|
|
Verified adjusted coverage at the 15th floor per previous inspection notes.
|
INSP-Sprinkler Rough-in | 2/17/2015 | 2/17/2015 | 2/17/2015 | P | PART |
Forrest France
|
|
|
Overhead modifications at the 14th floor okayed for cover per the scope of work. Fire sprinkler work at the 15th floor also approved for cover with the exception of overspacing between two heads at the SW hallway as noted on plans. To be adjusted and verified at final inspection.
|