INSP-Final Inspection | 3/30/2015 | 3/31/2015 | 3/31/2015 | A | PASS |
Forrest France
|
|
|
Verified correction items. With the exception of door closure repair at the west side of the brewery room, items are finished.
|
INSP-Final Inspection | 3/18/2015 | 3/20/2015 | 3/20/2015 | A | PART |
Forrest France
|
|
|
Completed inspection of the new system addition per approved plans. Items noted include; missing seismic brace, spacing at uprights above the kitchen coolers needs adjustment, missing door closure at the west side of the brewery to meet conditions necessary for use of the room design method as indicated, existing system riser is overdue annual inspection.
|
INSP-Sprinkler Rough-in/Hydro | 3/16/2015 | 3/17/2015 | 3/17/2015 | P | PART |
Forrest France
|
|
|
Overhead hydrostatic test of the system addition completed satisfactory.
|