INSP-Final Inspection | 3/26/2015 | 3/27/2015 | 3/27/2015 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 3/23/2015 | 3/26/2015 | 3/26/2015 | P | FAIL |
Troy Cobbley
|
|
|
Fire pump certification and flow test with factory rep. passed as witnessed by Tim Frost. Still need to verify connections to the FACP.
|
INSP-Sprinkler Rough-in/Hydro | 3/24/2015 | 3/25/2015 | 3/25/2015 | A | PASS |
Troy Cobbley
|
|
|
Hydro test fo the fire pump assmbly passed
|
INSP-Sprinkler Rough-in/Hydro | 3/13/2015 | 3/16/2015 | 3/16/2015 | A | PASS |
Troy Cobbley
|
|
|
Overhead hydro of the wet system passed. Fire pump assembly not hydro tested. Rough-in of the fire pump assembly passed.
|
INSP-Sprinkler Rough-in | 3/12/2015 | 3/13/2015 | 3/13/2015 | A | PASS |
Troy Cobbley
|
|
|
Overhead rough-in of the ware house passed
|