INSP-Final Inspection | 9/21/2015 | 9/22/2015 | 9/22/2015 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete
|
INSP-Sprinkler Rough-in | 8/12/2015 | 8/13/2015 | 8/13/2015 | A | PASS |
Troy Cobbley
|
|
|
Tenting and rough-in passed. Piping can be covered.
|
INSP-Sprinkler Rough-in/Hydro | 8/12/2015 | 8/12/2015 | 8/12/2015 | P | PASS |
Troy Cobbley
|
|
|
overhead hydro test passed
|
INSP-Supply line flush | 7/28/2015 | 7/29/2015 | 7/29/2015 | A | PASS |
Troy Cobbley
|
|
|
Underground flush passed
|
INSP-Sprinkler Rough-in/Hydro | 6/11/2015 | 6/12/2015 | 6/12/2015 | A | PASS |
Jim Page
|
|
|
Underground cover inspection passed/complete
|