INSP-Final Inspection | 7/6/2015 | 7/7/2015 | 7/7/2015 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection passed/complete
|
INSP-Final Inspection | 6/24/2015 | 6/25/2015 | 6/25/2015 | P | PART |
Jim Page
|
|
|
Contractor is to submit as-build drawings for addition of vestibules at main entries causing overspace issue, TVFP added fire sprinkler heads (One head off of one inch, total of 3 saddle tapped on branch line) around vestibules to accomidate new install and correct overspace issue.
|