INSP-Final Inspection | 11/23/2015 | 11/23/2015 | 11/23/2015 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 11/2/2015 | 11/2/2015 | 11/2/2015 | P | FAIL |
Troy Cobbley
|
|
|
All items completed except for forward flush and fire alarm interconnections.
|
INSP-Sprinkler Rough-in/Hydro | 10/29/2015 | 10/29/2015 | 10/29/2015 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro test passed
|
INSP-Sprinkler Rough-in/Hydro | 10/5/2015 | 10/5/2015 | 10/5/2015 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro test passed.
|
INSP-Sprinkler Rough-in/Hydro | 10/1/2015 | 10/2/2015 | 10/2/2015 | A | FAIL |
Troy Cobbley
|
|
|
I performed above ground hydro test twice but it failed both times due to a visible loss of pressure at the guage. It appears the aux. drain valve may be leaking.
|
INSP-Sprinkler Rough-in/Hydro | 9/22/2015 | 9/23/2015 | 9/23/2015 | A | PASS |
Troy Cobbley
|
|
|
Piping above gridded ceilings is ok to cover.
|
INSP-Sprinkler Rough-in | 9/9/2015 | 9/10/2015 | 9/10/2015 | A | PART |
Troy Cobbley
|
|
|
Rough-in for the overhead piping is passed as far as the installation. I noted two areas of concern which are the hvac unit ducting that penatrates the roof is obstructing the discharge of the ESFR heads in two locations, and the second area of concern is the walkway grating that exceeds 4'-0" in width (grating with accompanying support structure is 4'-5 1/2") with no sprinkler protection provided under it. Two areas have been provided protection but not the entire structure. I also noted that there is no protection under the two stairways to the mezzanine.
|