Permit Information
Permit NumberFIR15-00322
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 6650 W WINSTON LN
Project Name#6650 Aberdeen 4-Plex Phase 4
Customer Number 
ePlanReviewYes
Description
[Aberdeen 4-Plex Phase 4 #6650 - Building #3]
The fire sprinkler scope of work consists of protecting a four-plex with a NFPA 13R system

The underground was installed under permit FIR15-00311

L12B1 - 6650 Winston (Bldg 3): To construct a new 3,836 sq. ft., two story, Four unit, apartment building. Each unit has two bedrooms and two bathrooms. The 1st story units are 959 square feet and are required to be Type 'B' units. The 2nd story units are 959 square feet. All units share a common path of egress into and through a 1/2-hour rated exit corridor with 20 minute fire-resistive, listed, labeled, self-closing door assemblies from the dwelling units into the corridor. All construction per the approved plans, attached plan review report, and all other reviewing agencies approvals. One hour fire-partitions and one hour horizontal assemblies are required between dwelling units. This building is required to be fire sprinklered. The fire sprinkler system shall be per NFPA 13R as regulated by the fire department. DRH13-00276 & CUP13-00017 Per Planning and Zoning. **SRZ*
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/17/20158/18/20158/18/2015APASS
DetailsTroy Cobbley
permit finaled
INSP-Final Inspection8/17/20158/17/20158/17/2015PCANC
DetailsTroy Cobbley
To be rescheduled for tomorrow morning
INSP-Final Inspection8/13/20158/17/20158/17/2015AFAIL
DetailsTroy Cobbley
I left a voice message on contacts phone that I was on the way. Got to job site and found no contact. I noted that the sticker on the bell is missing, heads still have masking tape from the painters on them and the boxes are missing that cover the piping in the storage rooms.
INSP-Sprinkler Rough-in/Hydro6/16/20156/16/20156/16/2015PPASS
DetailsTroy Cobbley
The overhead hydro and rough-in passed. Tenting passed. Piping can be covered.
INSP-Sprinkler Rough-in6/12/20156/15/20156/15/2015PFAIL
DetailsJim Page
Overhead piping not approved for cover, tenting still needs installed, piping not complete for rough to cover inspection.
INSP-Supply line flush6/12/20156/15/20156/15/2015PPASS
DetailsJim Page
Underground piping flush passed/complete
INSP-Supply line flush6/10/20156/11/20156/11/2015PFAIL
DetailsJim Page
Service not turned on to the building
INSP-Sprinkler Rough-in/Hydro6/9/20156/9/20156/10/2015PCANC
DetailsJim Page
Canceled per conversation with Colton, phone ####-####, service was not turned on to building.
INSP-Supply line flush6/9/20156/9/20156/9/2015PCANC
DetailsTroy Cobbley
This is an underground flush request. Colton is the contact. Thanks! Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus