INSP-Final Inspection | 9/24/2015 | 9/25/2015 | 9/25/2015 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 9/23/2015 | 9/24/2015 | 9/24/2015 | A | FAIL |
Troy Cobbley
|
|
|
Left message on contacts phone that I was on the way. Fire alarm contractor and I waited for a bit. No inspection performed.
|
INSP-Sprinkler Rough-in/Hydro | 7/13/2015 | 7/14/2015 | 7/14/2015 | A | PASS |
Troy Cobbley
|
|
|
Overhead rough-in and tenting passed. Piping can be covered.
|
INSP-Sprinkler Rough-in/Hydro | 7/10/2015 | 7/13/2015 | 7/13/2015 | P | FAIL |
Troy Cobbley
|
|
|
Failed due to visible loss on all three guages
|
INSP-Final Inspection | 7/8/2015 | 7/9/2015 | 7/9/2015 | A | FAIL |
Troy Cobbley
|
|
|
Inspection was actually for an underground flush which passed inspection.
|
INSP-Sprinkler Rough-in | 6/16/2015 | 6/17/2015 | 6/17/2015 | A | PASS |
Troy Cobbley
|
|
|
Underground supply piping is ok to bury
|