INSP-Final Inspection | 9/24/2015 | 9/25/2015 | 9/25/2015 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete
|
INSP-Supply line flush | 8/13/2015 | 8/13/2015 | 8/13/2015 | P | PASS |
Jim Page
|
|
|
Underground supply line flush passed/complete
|
INSP-Sprinkler Rough-in/Hydro | 8/11/2015 | 8/11/2015 | 8/11/2015 | P | DONE |
Tim Frost
|
|
|
Passed underground hydro.
|
INSP-Sprinkler Rough-in | 8/3/2015 | 8/3/2015 | 8/4/2015 | P | PASS |
Jim Page
|
|
|
Underground cover inspection passsed/complete, approved for cover
|