Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR15-00353
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 1406 N FRY LN
Project Name#1406 Aberdeen 4-Plex Phase 4
Customer NumberUDG ONLY
ePlanReviewYes
Description
[Aberdeen #4 - #1406 - Udg] - Quick Permit
This is for the dedicated 2" poly UG line. The complete fire sprinkler system will be submitted at a later date.

L8B1 - 1406 Fry (Bldg 7): To construct a new 3,909 sq. ft., two story, Four unit, apartment building. Each unit has two bedrooms and two bathrooms. 1st story unit 101 is 959 square feet, unit 102 is 1,007 square feet, and both are required to be Type 'B' units. 2nd story unit 201 is 959 square feet and unit 202 has 984 square feet. All units share a common path of egress into and through a 1/2-hour rated exit corridor with 20 minute fire-resistive, listed, labeled, self-closing door assemblies from the dwelling units into the corridor. All construction per the approved plans, attached plan review report, and all other reviewing agencies approvals. One hour fire-partitions and one hour horizontal assemblies are required between dwelling units. This building is required to be fire sprinklered. The fire sprinkler system shall be per NFPA 13R as regulated by the fire department. DRH13-00276 & CUP13-00017 Per Planning and Zoning. **SRZ*
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/24/20158/25/20158/25/2015APASS
DetailsTroy Cobbley
Permit finaled
INSP-Sprinkler Rough-in7/22/20157/22/20157/22/2015PPASS
DetailsTroy Cobbley
Rough-in and tenting inspection passed. Piping can be covered.
INSP-Sprinkler Rough-in7/21/20157/22/20157/22/2015ACANC
DetailsTroy Cobbley
Colton Cox is the contact. Thanks. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
INSP-Sprinkler Rough-in/Hydro7/10/20157/13/20157/13/2015APASS
DetailsTroy Cobbley
The overhead hydro passed
INSP-Final Inspection7/8/20157/9/20157/9/2015AFAIL
DetailsTroy Cobbley
Inspection was actually for a undergrond flush which passed.
INSP-Sprinkler Rough-in6/11/20156/12/20156/12/2015APASS
DetailsJim Page
Underground cover inspection passed/complete