Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR15-00358
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 1430 N FRY LN
Project Name#1430 Aberdeen 4-Plex Phase 4
Customer Number 
ePlanReviewYes
Description
[Aberdeen 4-Plex Phase 4 #1430 - Building #1]
CPVC piping is being used with extended coverage residential sprinklers to protect a two level, four unit apartment building using NFPA 13R

The underground is under permit FIR15-00352

L9B1 - 1430 Fry (Bldg 1): To construct a new 3,842 sq. ft., two story, Four unit, apartment building. Each unit has two bedrooms and two bathrooms. The 1st story units are 959 square feet and are required to be Type 'B' units. The 2nd story units are 962 square feet. All units share a common path of egress into and through a 1/2-hour rated exit corridor with 20 minute fire-resistive, listed, labeled, self-closing door assemblies from the dwelling units into the corridor. All construction per the approved plans, attached plan review report, and all other reviewing agencies approvals. One hour fire-partitions and one hour horizontal assemblies are required between dwelling units. This building is required to be fire sprinklered. The fire sprinkler system shall be per NFPA 13R as regulated by the fire department. DRH13-00276 & CUP13-00017 Per Planning and Zoning. **SRZ*
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection9/1/20159/1/20159/1/2015PPASS
DetailsTroy Cobbley
permit finaled
INSP-Final Inspection8/27/20158/31/20158/31/2015ACANC
DetailsTroy Cobbley
Not ready for final due to fire alarm
INSP-Sprinkler Rough-in6/26/20156/26/20156/26/2015PPASS
DetailsJim Page
Inspection was for a rough-in/hydro, not rough in only. 1st floor, 2nd floor and FDC hydrostatic test passed/complete
INSP-Supply line flush6/24/20156/25/20156/25/2015PDONE
DetailsJim Page
Supply line fush passed/complete