Permit NumberFIR15-00401
StatusIssued
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 513 E PARKCENTER BLVD
Project NameThe District: Cottages # B-1
Customer Number 
ePlanReviewYes
Description
[The District - Cottage Buidling B - #1 - Udg Only] - Quick Permit
Connect to the new 4" gate valve and install new 4" C900 UG pipe into the new building for a fire sprinkler system per NFPA 13R, 2013 and the City of Boise.

(THE DISTRICT AT PARKCENTER - COTTAGE BUILDING B - #1) (The drawings are filed under permit BLD14-01818 in ePlanReview) To construct a 10 dwelling unit two story apartment building with six units having their own garage (i.e. 6 garages). Four dwelling units will not have garages. The total floor area of this building is about 12,497 square feet (8,089 square feet 1st story and 4,408 square feet 2nd story). All ground floor units within Cottage Building B - #1 and Cottage Building B - #2 are required to comply as Type B dwelling units. Two ground floor units within Cottage Building A - #2 are required to comply as Type A dwelling units. Work is to include interior nonbearing walls, 1-hr bearing walls, 1-hr roof-ceiling assemblies, 1-hr floor-ceiling assemblies, 1-hr dwelling unit separations, attic insulation, interior doors, exterior windows and doors, insulated exterior walls, “Hardi-board” exterior siding, exterior manufactured stone wainscot, composition roof shingles, common stairways within a 1-hr corridor open to the outside, private interior stairways, garages, garage overhead doors, millwork, and finishes. Structural work includes concrete footings, concrete stem walls, concrete floor slabs on grade with thickened footings at interior bearing walls, wood floor trusses, wood roof trusses, wood columns, wood beams, and shear walls. Special inspection is required for soils, concrete, and wood. The designs for the roof trusses and floor trusses are deferred submittal items. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13R as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Supply line flush5/25/20165/27/20165/27/2016ADONE
DetailsJim Page
Underground main line flush complete
INSP-Sprinkler Rough-in/Hydro5/24/20165/25/20165/25/2016APASS
DetailsJim Page
200 psi hydrostatic test complete for underground supply.
INSP-Sprinkler Rough-in4/4/20164/5/20164/5/2016PPASS
DetailsJim Page
Rough to cover inspection for underground supply complete, underground approved for cover.
INSP-Sprinkler Rough-in/Hydro3/14/20163/15/20163/15/2016PPASS
DetailsJim Page
Underground hydrostatic (200 psi for 2 hours) test passed/complete. Main line underground flush complete.