Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR15-00427
StatusFinaled
Name MICRON TECHNOLOGY INC FP
Site Address 8000 S FEDERAL WAY
Project NameMicron B 2 / 3
Customer NumberC23941
ePlanReviewNo
Description
[Micron Buildings 2-3 - Second Floor - C23941]
The fire sprinkler scope of work consists of removing an existing dry system and replacing it with a wet grid system to protect an existing area of the building. The system also has below duct protection. The system is design for Ordinary Hazard II to protect H5 with 500 Gpm for hose streams per IFC.

[BLD15-03146] - Micron Building 2 and 3 - (C23941) – B 2 & 3 Remodel to existing H-5 Area that is actual split into two separate buildings to comply with building area provisions To remodel the entire 39,000 square foot first floor area and a large area of the second floor. These buildings are sprinklered based on “H” occupancy requirements. The work includes: construction of new interior partitions, installation of new lighting, installation of new plumbing, installation of new HEPA ceiling system, installation of new mechanical, installation of new accessible doors / hardware, and interior finishes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/19/201610/19/201610/19/2016PPASS
DetailsJim Page
Final fire sprinkler inspection passed/complete.