Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR15-00439
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 250 E PARKCENTER BLVD
Project NameALBERTSON G.O. PHASE 2
Customer Number 
ePlanReviewYes
Description
[Albertson General Offices Phase 2]
The fire sprinkler scope of work consists of adding, plugging and relocating sprinklers to accommodate new wall and ceiling configuration.

(ALBERTSON'S GENERAL OFFICE)(SECOND FLOOR PHASE 2) This building is fully fire sprinklered for area increase and has 60 ft yards on all sides for unlimited area. Permit to renovate the approx. 30,000 sq ft of existing SW office space. Scope of work to include minor demolitions as shown on approved plans, new interior nonbearing partition walls to create new offices and add new systems furniture to open work space. New finishes shall meet IBC chapter 8. New lighting to be installed, the mechanical system will remain and be modified to accommodate the new layout. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. The entire buildng except for the atrium has had the sprinkler heads upgraded to QR heads under FIR07-01005. No rated corridors are required under current code with upgraded spirinkler heads. **ajs**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/14/201510/15/201510/14/2015APASS
DetailsJim Page
Final fire sprinkler inspection passed/complete
INSP-Sprinkler Rough-in7/20/20157/20/20157/20/2015PPASS
DetailsJim Page
Rough-in inspection passed/complete, approved for cover