INSP-Final Inspection | 9/1/2015 | 9/2/2015 | 9/2/2015 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 8/19/2015 | 8/19/2015 | 8/19/2015 | P | PART |
Jim Page
|
|
|
Building B, all actuating devices reported to panel. Building C, low air alarm would not clear, flow switch did not report to pane/go into alarm. Other actuating devices reported to FACP
|
INSP-Sprinkler Rough-in/Hydro | 8/18/2015 | 8/19/2015 | 8/19/2015 | A | CANC |
Troy Cobbley
|
|
|
Troy, We would like to schedule this for late morning if at all possible. Thank you. Jason ###-####. Phone #: ###-#### >> Inspection requested via web by Jason Minnick
|