Permit Information
Permit NumberFIR15-00501
StatusFinaled
Name TRIBAL FIRE SYSTEMS
Site Address 12301 W EXPLORER DR
Project NameSyringa CO-LO Reno TI
Customer Number 
ePlanReviewYes
Description
[Syringa Co-Lo Renovation]
The fire sprinkler scope of work consists of removing the existing main and sprinkler system in a server room. A new main and new double interlock preaction system will then be installed. A new backflow preventer will be installed into the existing fire sprinkler riser.

(SYRINGA NETWORKS) For tenant improvements to an existing 1,671 sq. ft. tenant space with work to include the constructio of new interior nonbearing partition wall to create server rooms, the installation of new rooftop ventilation fans, creating a new opening in an exterior wall, construction of an exterior screen fence and the placement of exterior cooling units per the approved plans. this is a fully fire sprinklered building for area increase. Any alterations to the sprinkler system will require a separate permit and shall comply with NFPA 13 as regulated by the fire department. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/9/20163/9/20163/9/2016PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Sprinkler Rough-in10/21/201510/22/201510/22/2015APASS
DetailsTroy Cobbley
EQ Bracing has been installed
INSP-Sprinkler Rough-in10/13/201510/13/201510/13/2015PPART
DetailsTroy Cobbley
Missing nearly all of the earth quake bracing. Piping can be covered but upon return inspection areas will have to be removed to facilitate re-inspection of the bracing.
INSP-Sprinkler Rough-in/Hydro10/5/201510/6/201510/6/2015PPASS
DetailsJim Page
24 hour air test passed/complete
INSP-Sprinkler Rough-in/Hydro10/5/201510/5/201510/5/2015PPART
DetailsJim Page
200 psi hydrostatic test passed/complete. 24 hour air test started at 3:30pm at 50 psi.
INSP-Sprinkler Rough-in/Hydro9/23/20159/23/20159/23/2015PCANC
DetailsTroy Cobbley
24 hour air Phone #: ###-#### Inspection requested via web by John Venche
INSP-Sprinkler Rough-in/Hydro9/16/20159/17/20159/17/2015ACANC
DetailsTroy Cobbley
Not ready for hydro yet
INSP-Sprinkler Rough-in9/15/20159/15/20159/15/2015PPASS
DetailsTroy Cobbley
Overhead piping rough-in passed. Just missing the earth quake bracing on the relocated 4" main. Riser not built yet.
INSP-Sprinkler Rough-in9/14/20159/15/20159/15/2015AFAIL
DetailsTroy Cobbley
No city approved plans on site. I did walk with Bruce and noted missing branch line restraints