INSP-Final Inspection | 8/30/2019 | 8/30/2019 | 8/30/2019 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled by Jim.
Jim, this project was finaled and I emailed the Record of Completion over too you. Eric from my office said I needed to change the inspection type in the portal so you can sign it off. Brent Crane Inspection requested via web by Fire Scheduler
|
INSP-Alarm Testing | 8/4/2015 | 8/5/2015 | 8/5/2015 | A | PASS |
Jim Page
|
|
|
Fire alarm inspection passed/complete
|