INSP-Final Inspection | 9/2/2016 | 9/2/2016 | 9/2/2016 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete
|
INSP-Sprinkler Rough-in/Hydro | 9/1/2016 | 9/2/2016 | 9/2/2016 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection complete for overhead fire sprinkler piping complete.
|
INSP-Sprinkler Rough-in/Hydro | 4/19/2016 | 4/19/2016 | 4/19/2016 | P | PASS |
Jim Page
|
|
|
200 spi hydrostatic test for overhead fire sprinklers passed/complete. Overhead fire sprinkler rough-in inspection passed/complete.
|
INSP-Sprinkler Rough-in/Hydro | 3/29/2016 | 3/30/2016 | 3/30/2016 | A | PASS |
Jim Page
|
|
|
Underground hydrostatic test complete. Underground main line flush complete.
|
INSP-Sprinkler Rough-in | 11/24/2015 | 11/25/2015 | 11/25/2015 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection passed/complete for underground, approved for cover.
|