INSP-Final Inspection | 3/14/2016 | 3/14/2016 | 3/14/2016 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete
|
INSP-Sprinkler Rough-in | 2/22/2016 | 2/22/2016 | 2/22/2016 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection passed/complete, approved for cover.
|
INSP-Sprinkler Rough-in | 12/29/2015 | 12/30/2015 | 12/30/2015 | A | CANC |
Jim Page
|
|
|
Inspection request cancelled per conversation with Richard, phone number ###-####, area of inspection not ready for final inspection.
|
INSP-Sprinkler Rough-in | 12/28/2015 | 12/29/2015 | 12/29/2015 | A | CANC |
Jim Page
|
|
|
Inspection cancelled per conversation with Richard, Phone #: ###-####. Will reschedule to coincide with alarms and life fire safety.
|
INSP-Sprinkler Rough-in | 11/10/2015 | 11/10/2015 | 11/10/2015 | P | PART |
Jim Page
|
|
|
Notated on city approved drawings with red ink the hard-lids/area's that are approved for cover.
|