Permit Information
Permit NumberFIR15-00724
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 7360 W BETHEL ST
Project NamePORT OF HOPE T.I.
Customer Number 
ePlanReviewYes
Description
[Port of Hope TI]
The fire sprinkler scope of work consists of adding, plugging and relocating sprinklers to accommodate new wall and ceiling configuration.

(PORT OF HOPE) Remodel changing occupancy to a re-entry treatment, resident treatment and outpatient treatment center (halfway house per zoning ordinance) per approved plans. Work to include new non-bearing walls, new ceilings, doors, windows, new accessible restrooms and shower rooms, fire sprinkler work, plumbing, mechanical and electrical. All work per the appeved plans, any redlines and the attached plan review report. This building is fully fire sprinklered for area increase. Any alterations to the sprinkler system will require a separate permit and shall comply with NFPA 13 and 72 as regulated by the fire department. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/22/20166/22/20166/22/2016PPASS
DetailsJim Page
Final fire sprinkler inspecion passed/complete.
INSP-Sprinkler Rough-in5/12/20165/13/20165/13/2016APASS
DetailsTroy Cobbley
Piping above the ceilings for the north half of the building is ok to cover.
INSP-Sprinkler Rough-in5/3/20165/4/20165/4/2016ACANC
DetailsTroy Cobbley
Rick Phone #: ###-####
INSP-Final Inspection2/26/20162/26/20162/26/2016APART
DetailsTroy Cobbley
Fire sprinkler work is complete on the south half of the building. The north half of the building needs the drops cut but has the existing upright protection remaining and spaced according to the new walls.
INSP-Sprinkler Rough-in2/4/20162/5/20162/5/2016APASS
DetailsJim Page
Rough to cover inspection performed for ceiling gridded area's, south side if dividing wall, notated area's approved for cover with red ink on the city approved drawing.
INSP-Sprinkler Rough-in12/8/201512/8/201512/8/2015PPASS
DetailsTroy Cobbley
See the city approved plans for hard lid areas where the piping is ok to cover. I noted that branch line restraints will be required for all new branchlines that require it.
INSP-Sprinkler Rough-in11/30/201512/1/201512/1/2015APASS
DetailsJim Page
A wall is installed down the middle of the building, dividing the building into two sections, whole building is under same FIR number. Perfromed rough to cover inspection for hardlids, hardlids on south side of wall approved for cover. Performed rough in inspection for south side of building up to dividing wall, rough in inspection complete. Contractor will schedule rough to cover inspection for gridded area's after heads are cut into place.