INSP-Final Inspection | 6/27/2016 | 6/30/2016 | 6/30/2016 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete.
|
INSP-Final Inspection | 6/13/2016 | 6/13/2016 | 6/13/2016 | P | PART |
Jim Page
|
|
|
Partial final inspection for overhead fire sprinklers complete, FIR permit for fire sprinklers cannot be finaled until fire alarm signals have been tested/verified and monitoring station has recieved signals.
|
INSP-Final Inspection | 6/8/2016 | 6/13/2016 | 6/13/2016 | A | CANC |
Jim Page
|
|
|
Please let Jake know when you are headed out, thanks! Phone #: ###-#### >> Inspection requested via web by Anthony Minichiello Inspection cancelled from web by: Anthony Minichiello
|
INSP-Sprinkler Rough-in | 3/2/2016 | 3/3/2016 | 3/3/2016 | P | PASS |
Jim Page
|
|
|
Tenting inspection for 2nd level passed/complete, overhead piping for second level approved for cover.
|
INSP-Supply line flush | 3/1/2016 | 3/3/2016 | 3/3/2016 | A | DONE |
Jim Page
|
|
|
Underground main supply flush complete.
|
INSP-Sprinkler Rough-in/Hydro | 1/26/2016 | 1/26/2016 | 1/26/2016 | P | PART |
Jim Page
|
|
|
2 hour hydrostatic test @ 200psi complete for overhead sprinkler piping. Rough to cover inspection complete for building 4, 1st level approved for cover, 2nd level needs tenting installed over piping in attic space, can not cover 2nd level until tenting is inspected.
|
INSP-Sprinkler Rough-in/Hydro | 1/25/2016 | 1/25/2016 | 1/25/2016 | P | CANC |
Jim Page
|
|
|
Inspection request cancelled per conversation with Anthony, phone number ###-####, will reshedule inspection request for later date.
|