Permit Information
Permit NumberFIR15-00806
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 513 E PARKCENTER BLVD
Project NameDistrict @ Parkcenter Cottage
Customer Number 
ePlanReviewYes
Description
[The District at Park Center - Cottage Building B - #1]
The fire sprinkler scope of work consists of protecting a two level apartment building per NFPA 13R. The system is supplied by 4”x86’ ± C-900 underground piping. Extended coverage residential sprinklers and CPVC piping are being utilized.

(THE DISTRICT AT PARKCENTER - COTTAGE BUILDING B - #1) (The drawings are filed under permit BLD14-01818 in ePlanReview) To construct a 10 dwelling unit two story apartment building with six units having their own garage (i.e. 6 garages). Four dwelling units will not have garages. The total floor area of this building is about 12,497 square feet (8,089 square feet 1st story and 4,408 square feet 2nd story). All ground floor units within Cottage Building B - #1 and Cottage Building B - #2 are required to comply as Type B dwelling units. Two ground floor units within Cottage Building A - #2 are required to comply as Type A dwelling units. Work is to include interior nonbearing walls, 1-hr bearing walls, 1-hr roof-ceiling assemblies, 1-hr floor-ceiling assemblies, 1-hr dwelling unit separations, attic insulation, interior doors, exterior windows and doors, insulated exterior walls, “Hardi-board” exterior siding, exterior manufactured stone wainscot, composition roof shingles, common stairways within a 1-hr corridor open to the outside, private interior stairways, garages, garage overhead doors, millwork, and finishes. Structural work includes concrete footings, concrete stem walls, concrete floor slabs on grade with thickened footings at interior bearing walls, wood floor trusses, wood roof trusses, wood columns, wood beams, and shear walls. Special inspection is required for soils, concrete, and wood. The designs for the roof trusses and floor trusses are deferred submittal items. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13R as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/25/201610/26/201610/26/2016APASS
DetailsJim Page
Final fire sprinkler inspection passed/complete.
INSP-Sprinkler Rough-in7/27/20167/27/20167/27/2016PPASS
DetailsJim Page
Tenting insulation inspection complete for overhead fire sprinkler piping located in attic spaces, overhead fire sprinkler piping approved for cover.
INSP-Sprinkler Rough-in/Hydro7/20/20167/20/20167/20/2016PPASS
DetailsJim Page
Hydrostatic test for overhead fire sprinkler piping complete.
INSP-Sprinkler Rough-in7/20/20167/20/20167/20/2016PPART
DetailsJim Page
Rough to cover inspection complete for overhead fire sprinkler piping, fire sprinkler piping not located in attic space approved for cover. Overhead fire sprinkler piping located in attic area's cannot be covered until tenting inspection has been completed.
INSP-Sprinkler Rough-in/Hydro6/22/20166/23/20166/23/2016APASS
DetailsJim Page
Level 2 hydrostatic test for overhead fire sprinkler piping complete.
INSP-Sprinkler Rough-in6/22/20166/23/20166/23/2016APASS
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping on level 2 complete, level 2 overhead fire sprinkler piping approved for cover.
INSP-Sprinkler Rough-in5/20/20165/20/20165/20/2016PPASS
DetailsJim Page
Rough to cover inspection for tenting of overhead fire sprinkler piping in attic space south of the firedoors complete, approved for cover. This inspection completes rough to cover inspections for this building, all piping approved for cover.
INSP-Sprinkler Rough-in4/28/20164/29/20164/29/2016PPART
DetailsJim Page
200 psi hydrostatic test complete for level three, this completes the hydrostatic testing for this building. Rough in inspection complete for level 3, tenting insulation for overhead fire sprinkler piping, north of the fire doors complete. Hardlids north of the fire doors approved for cover. Remaining cover inspection for overhead fire sprinkler tenting south of the fire doors will be scheduled when insulation install is complete.
INSP-Sprinkler Rough-in/Hydro4/27/20164/28/20164/28/2016PCANC
DetailsJim Page
Inspection request cancelled by point of contact on project, tenting insulation will not be complete by the time inspection can be done, inspection request will be rescheduled after insulation is complete
INSP-Sprinkler Rough-in4/13/20164/13/20164/13/2016PPART
DetailsJim Page
2nd floor rough to cover complete, coordinated with point of contact placement for hanger adjustment. 2nd floor approved for cover.
INSP-Sprinkler Rough-in/Hydro4/13/20164/13/20164/13/2016PPART
DetailsJim Page
2nd floor hydrostatic test complete.
INSP-Sprinkler Rough-in4/12/20164/12/20164/12/2016PPART
DetailsJim Page
First floor rough to cover inspection complete, first floor approved for cover.
INSP-Sprinkler Rough-in/Hydro4/12/20164/12/20164/12/2016PPART
DetailsJim Page
Hydrostatic test complete for first floor overhead fire sprinkler piping.