Information based on query as of Thursday, June 20, 2024.
Permit Information
Permit NumberFIR15-00811
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 521 E PARKCENTER BLVD
Project NameDistrict @ Parkcenter Cottage
Customer Number 
ePlanReviewYes
Description
[The District at Park Center - Cottage Building B - #2]
The fire sprinkler scope of work consists of protecting a two level apartment building per NFPA 13R. The system is supplied by 4”x88’ ± C-900 underground piping. Extended coverage residential sprinklers and CPVC piping are being utilized.

(THE DISTRICT AT PARKCENTER - COTTAGE BUILDING B - #2) (The drawings are filed under permit BLD14-01818 in ePlanReview) To construct a 10 dwelling unit two story apartment building with six units having their own garage (i.e. 6 garages). Four dwelling units will not have garages. The total floor area of this building is about 12,497 square feet (8,089 square feet 1st story and 4,408 square feet 2nd story). All ground floor units within Cottage Building B - #1 and Cottage Building B - #2 are required to comply as Type B dwelling units. Two ground floor units within Cottage Building A - #2 are required to comply as Type A dwelling units. Work is to include interior nonbearing walls, 1-hr bearing walls, 1-hr roof-ceiling assemblies, 1-hr floor-ceiling assemblies, 1-hr dwelling unit separations, attic insulation, interior doors, exterior windows and doors, insulated exterior walls, “Hardi-board” exterior siding, exterior manufactured stone wainscot, composition roof shingles, common stairways within a 1-hr corridor open to the outside, private interior stairways, garages, garage overhead doors, millwork, and finishes. Structural work includes concrete footings, concrete stem walls, concrete floor slabs on grade with thickened footings at interior bearing walls, wood floor trusses, wood roof trusses, wood columns, wood beams, and shear walls. Special inspection is required for soils, concrete, and wood. The designs for the roof trusses and floor trusses are deferred submittal items. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13R as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/10/201610/12/201610/12/2016PPASS
DetailsJim Page
Final fire sprinkler inspection passed/complete.
INSP-Sprinkler Rough-in6/15/20166/16/20166/16/2016APASS
DetailsJim Page
Tenting inspection complete, all overhead fire sprinkler piping approved for cover.
INSP-Sprinkler Rough-in/Hydro5/31/20166/1/20166/1/2016APASS
DetailsJim Page
200 psi hydrostatic test for overhead fire sprinkler piping complete for entire building.
INSP-Sprinkler Rough-in5/24/20165/24/20165/24/2016PPART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping complete, piping that is not exposed to attic spaces approved for cover. Fire sprinkler piping located in attic spaces cannot be covered until tenting inspection is performed and approved.
INSP-Sprinkler Rough-in5/20/20165/20/20165/20/2016PCANC
DetailsJim Page
Inspection request was for FIR15-00806, this inspection request cancelled and new inspection request generated for correct permit.