INSP-Final Inspection | 12/17/2015 | 12/18/2015 | 12/18/2015 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 12/14/2015 | 12/15/2015 | 12/15/2015 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection passed/complete, all area's approved for cover.
|
INSP-Sprinkler Rough-in | 12/14/2015 | 12/14/2015 | 12/14/2015 | P | CANC |
Troy Cobbley
|
|
|
Rescheduled for tomorrow morning
|
INSP-Sprinkler Rough-in | 12/10/2015 | 12/10/2015 | 12/10/2015 | P | CANC |
Troy Cobbley
|
|
|
Doug Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 12/2/2015 | 12/2/2015 | 12/2/2015 | P | PART |
Troy Cobbley
|
|
|
Rough-in installation looks good except the new pendants that have been added in the soffit that was not shown on the plans need to meet NFPA 13-8.6.4.1.1.3. Plans/hydraulic calculations will need to be verified by plan review.
|
INSP-Sprinkler Rough-in | 11/25/2015 | 11/27/2015 | 11/27/2015 | A | PASS |
Troy Cobbley
|
|
|
Piping above restrooms/entry/closet is ok to cover.
|
INSP-Sprinkler Rough-in | 11/24/2015 | 11/24/2015 | 11/24/2015 | P | FAIL |
Troy Cobbley
|
|
|
No approved plans/notes on site. No inspection performed.
|