INSP-Final Inspection | 8/23/2016 | 8/24/2016 | 8/24/2016 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 4/26/2016 | 4/27/2016 | 4/27/2016 | A | PASS |
Troy Cobbley
|
|
|
Underground hydro passed
|
INSP-Sprinkler Rough-in/Hydro | 12/15/2015 | 12/16/2015 | 12/16/2015 | P | PASS |
Troy Cobbley
|
|
|
underground flush passed on both risers. Remaining underground piping is ok to cover.
|
INSP-Sprinkler Rough-in | 12/9/2015 | 12/9/2015 | 12/9/2015 | P | PASS |
Troy Cobbley
|
|
|
Remaining underground supply is ok for cover.
|
INSP-Sprinkler Rough-in | 12/7/2015 | 12/7/2015 | 12/7/2015 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for underground supply line piping that was inspected today and is ok for cover.
|
INSP-Sprinkler Rough-in | 12/4/2015 | 12/4/2015 | 12/4/2015 | P | PART |
Jim Page
|
|
|
Notated area's on the city approved underground drawing allowed for cover. Contractor will schedule inspection for the rest of the underground cover for a later date.
|