INSP-Final Inspection | 3/24/2016 | 3/24/2016 | 3/24/2016 | P | PASS |
Jim Page
|
|
|
Final fire alarm inspection passed/complete
|
INSP-Alarm Testing | 3/24/2016 | 3/24/2016 | 3/24/2016 | P | CANC |
Jim Page
|
|
|
Alarm testing complete
|
INSP-Final Inspection | 3/22/2016 | 3/23/2016 | 3/23/2016 | A | CANC |
Jim Page
|
|
|
Inspection request cancelled, fire sprinkler dry systems are ready for final alarm test.
|
INSP-Final Inspection | 3/18/2016 | 3/22/2016 | 3/22/2016 | A | CANC |
Jim Page
|
|
|
Inspection request cancelled per conversation with Ken Phone #: ###-####, inspection request will be rescheduled.
|