Permit Information
Permit NumberFIR16-00101
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 1024 W BANNOCK ST
Project NameHyatt Place - Boise
Customer Number 
ePlanReviewYes
Description
[Hyatt Place - Boise]
The fire sprinkler scope of work consists of protecting a five level building with a wet system and two wet manual standpipes. Each floor is supplied though a floor control valve from a combination riser. Concealed CPVC piping and residential sprinkler are being used on the upper floors. The building is protected per NFPA 13 and 14.

The underground is under permit FIR16-00103

Permit for the construction of a new 92,614 sq. ft. 5 story hotel of type IIIB construction with a total of 150 sleeping units 8 of which are accessible units. The first story consists of meeting rooms, kitchen, lobby and laundry facility area as well as 7 sleeping units. The first story is separated from the remaining stories by a one hour assembly for building area with all supporting construction on the first story required to be one hour construction. The building exterior walls are fire retardant treated wood with interior wood construction with the exception of some steel beams and columns. This building is fully fire sprinklered for story increase as well as A-2 and R occupancies.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/13/20174/17/20174/17/2017APASS
DetailsJim Page
Final fire sprinkler inspection passed/complete
INSP-Final Inspection4/12/20174/14/20174/13/2017PCANC
DetailsJim Page
Inspection scheduled for 17APR2017
INSP-Sprinkler Rough-in/Hydro3/21/20173/22/20173/22/2017APASS
DetailsJim Page
Rough to cover inspection for level 1 complete, approved for cover. Hydrostatic test for overhead fire sprinkler piping on level 1 complete.
INSP-Sprinkler Rough-in/Hydro2/7/20172/7/20172/7/2017PPART
DetailsJim Page
Hydrostatic test complete for overhead fire sprinkler piping located on levels 2, 3, 4, and 5. Hydrostatic test complete for east and west standpipes (verified valves were in the open position before hydrostatic test time was started).
INSP-Sprinkler Rough-in1/24/20171/25/20171/24/2017APART
DetailsJim Page
Overhead fire sprinkler piping/pendant heads located above siffits/hardlids on level one appeoved for cover.
INSP-Sprinkler Rough-in1/18/20171/20/20171/20/2017APART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping located in elevator lobbies on levels 4 and 5 complete, approved for cover.
INSP-Sprinkler Rough-in1/3/20171/3/20171/3/2017PPART
DetailsJim Page
Rough to cover inspection for sprinkler piping/sprinklers located in level 2 room entries complete, approved for cover.
INSP-Sprinkler Rough-in12/22/201612/22/201612/22/2016APART
DetailsJim Page
Rough to cover inspection for sprinkler piping/sprinklers located in level 3 room entries complete, approved for cover.
INSP-Sprinkler Rough-in/Hydro12/8/201612/9/201612/9/2016APART
DetailsJim Page
Rough to cover inspection for sprinkler piping/sprinklers located in level 4 room entries complete, approved for cover.
INSP-Sprinkler Rough-in11/11/201611/14/201611/14/2016APART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping located above drop down hardlids in level 5 rooms complete, overhead fire sprinkler piping located in drop down hardlids on level 5 approved for cover. Overhead fire sprinkler piping located in service rooms around level 4 elevator lobby approved for cover.
INSP-Sprinkler Rough-in11/7/201611/8/201611/8/2016PCANC
DetailsTroy Cobbley
Tyler Miller is the contact for this inspection. He needs a rough to cover inspection of 3 units on the 4th floor. Thank you
Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in10/18/201610/19/201610/19/2016PPASS
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping/tenting located above northwest stairwell and northwest hotel room on level 5 complete, overhead fire sprinkler piping located in noted area's approved for cover.
INSP-Sprinkler Rough-in10/18/201610/18/201610/18/2016PCANC
DetailsJim Page
Inspection request for 19OCT2016, this inspection request cancelled
INSP-Sprinkler Rough-in9/2/20169/6/20169/6/2016PPASS
DetailsJim Page
Rough to cover inspection for level 5 including pipe tenting complete, all rooms on level 5 (excluding the room directly attached to the west stairwell, small amount of overhead fire sprinkler piping will be installed at a later date) approved for cover, spot checking will be performed at a later date to verify proper insulation coverage on fire sprinkler piping located in attic spaces.
INSP-Sprinkler Rough-in9/1/20169/1/20169/1/2016PFAIL
DetailsJim Page
Fire sprinkler piping throughout multiple rooms had plastic sheeting (Tenting) removed exposing the pipe in the attic space, plastic sheeting will need to be repaired and re-inspected before cover can be approved for level 5.
INSP-Sprinkler Rough-in/Hydro8/24/20168/25/20168/25/2016AFAIL
DetailsJim Page
Overhead fire sprinkler piping located in attic spaces on level 5 not approved for cover, plastic sheeting is installed over fire sprinkler piping but no insulation has been installed above piping, insulation tenting needs to installed over the fire sprinkler piping and inspected before cover of overhead fire sprinkler piping in attic spaces is approved.
INSP-Sprinkler Rough-in8/16/20168/19/20168/19/2016APART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping complete for rooms on levels 3, 4, and 5. Overhead fire sprinkler piping located in rooms on level 3 and 4 approved for cover, overhead fire sprinkler piping on level 5 needs to have tenting insulation installed and inspected before cover can be approved.
INSP-Sprinkler Rough-in6/10/20166/13/20166/13/2016APASS
DetailsJim Page
Rough to cover inspection complete for second floor rooms, notated city approved drawings with green highlighter/red ink for area's approved for cover.