INSP-Final Inspection | 9/30/2016 | 9/30/2016 | 9/30/2016 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Supply line flush | 5/26/2016 | 5/26/2016 | 5/26/2016 | P | PASS |
Troy Cobbley
|
|
|
Underground supply line flush passed.
|
INSP-Sprinkler Rough-in | 2/26/2016 | 2/29/2016 | 2/29/2016 | A | PASS |
Troy Cobbley
|
|
|
Remaining underground is ok to cover on the east building.
|
INSP-Sprinkler Rough-in | 2/26/2016 | 2/26/2016 | 2/26/2016 | P | PART |
Troy Cobbley
|
|
|
The underground piping near the United Water connection has been lowered. Piping can be covered up to the new thrust blocks which have not been poured or inspected yet. That portion is scheduled for monday. Received letter from Shilo taking responcibility for underground which was partially installed by a United Water contractor.
|
INSP-Sprinkler Rough-in/Hydro | 2/23/2016 | 2/24/2016 | 2/24/2016 | P | FAIL |
Troy Cobbley
|
|
|
Todays inspection was for the east building. Almost all of the underground supply piping has been installed/covered by a contractor that is not Shilo. The portion of previously buried piping that is uncovered measured only 3'-6" below grade. The portion that Shilo has installed is buried at the correct depth. The previously installed piping needs to be dug up and re-installed at a minimum 4'-6" bury depth as per Ordinance and plans. No piping is to be covered at this time.
|
INSP-Sprinkler Rough-in | 2/23/2016 | 2/23/2016 | 2/23/2016 | P | CANC |
Troy Cobbley
|
|
|
Concrete is being delivered at 3pm. Please schedule inspection with Bryan. Thanks. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|