INSP-Final Inspection | 5/23/2016 | 5/23/2016 | 5/23/2016 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete.
|
INSP-Sprinkler Rough-in | 5/10/2016 | 5/10/2016 | 5/10/2016 | P | CANC |
Jim Page
|
|
|
Duplicate inspection request, area of inspection requested has been approved for cover.
|
INSP-Sprinkler Rough-in | 5/9/2016 | 5/10/2016 | 5/10/2016 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for north side corridor located in basement level complete, north side basement corridor approved for cover.
|
INSP-Sprinkler Rough-in | 4/18/2016 | 4/19/2016 | 4/19/2016 | A | PASS |
Jim Page
|
|
|
Overhead fire sprinkler rough in inspection passed/complete for basement level,
|
INSP-Sprinkler Rough-in/Hydro | 4/13/2016 | 4/14/2016 | 4/14/2016 | A | PART |
Jim Page
|
|
|
Rough to cover inspection complete for first floor level, first floor approved for cover. Basement level still needs rough to cover inspection perfromed.
|