INSP-Final Inspection | 6/21/2016 | 6/23/2016 | 6/23/2016 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete
|
INSP-Sprinkler Rough-in | 6/15/2016 | 6/16/2016 | 6/16/2016 | P | PART |
Jim Page
|
|
|
Rough to cover inspection complete for overhead fire sprinkler piping located above gridded area's on the north side, north side gridded area's approved for cover.
|
INSP-Sprinkler Rough-in | 6/15/2016 | 6/15/2016 | 6/15/2016 | P | CANC |
Jim Page
|
|
|
Inspection request scheduled for wrong day, inspection rescheduled for 16June16
|
INSP-Sprinkler Rough-in | 6/15/2016 | 6/16/2016 | 6/15/2016 | P | CANC |
Jim Page
|
|
|
Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|
INSP-Sprinkler Rough-in | 5/6/2016 | 5/9/2016 | 5/9/2016 | P | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler located above the hardlids complete, piping above hardlids approved for cover.
|
INSP-Sprinkler Rough-in | 4/14/2016 | 4/15/2016 | 4/15/2016 | A | PART |
Jim Page
|
|
|
Rough to cover inspection complete for hardids, corridor/restroom hardlids approved for cover.
|