INSP-Final Inspection | 7/22/2016 | 7/26/2016 | 7/26/2016 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete
|
INSP-Sprinkler Rough-in | 7/7/2016 | 7/8/2016 | 7/8/2016 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection fore overhead fire sprinkler piping complete, overhead fire sprinkler piping approved for cover.
|
INSP-Sprinkler Rough-in | 4/27/2016 | 4/27/2016 | 4/27/2016 | P | PASS |
Jim Page
|
|
|
Previously noted items above restroom hardlids addressed, pendeant head in mens room relocated for proper spacing, upright head added to cover exposed combustible material that is attached to restroom ceiling joist. Overhead fire sprinkler piping above restroom hardlids approved for cover.
|
INSP-Sprinkler Rough-in | 4/26/2016 | 4/26/2016 | 4/26/2016 | P | FAIL |
Jim Page
|
|
|
Female restroom approved for cover, notated with red in on city approved plans heads that are okay to cover. First head in mens restroom not approved for cover, mens restroom sprinkler head scales at 9 foot off of wall on city approved drawings, sprinkler head is installed 10ft 5in off of wall, head needs to be relocated. 4X8 foot sheet of plywood is attached to ceiling joists above mens restroom, no upright protection for that area, combustible material needs to either be fire rated/treated, removed or upright protection installed for combustible material.
|