INSP-Final Inspection | 3/1/2018 | 3/1/2018 | 3/1/2018 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete.
|
INSP-Final Inspection | 12/29/2017 | 1/2/2018 | 1/2/2018 | A | CANC |
Jim Page
|
|
|
Inspection request cancelled per conversation with point of contact, Kevin Phone #: ###-####, inpsection will be rescheduled for a later date.
|
INSP-Sprinkler Rough-in/Hydro | 10/19/2017 | 10/19/2017 | 10/19/2017 | P | PART |
Jim Page
|
|
|
Hydrostatic test for level 3 complete. Rough to ocver inspection for remaining pipe on level 3 complete, approved for cover.
|
INSP-Sprinkler Rough-in/Hydro | 10/4/2017 | 10/5/2017 | 10/5/2017 | A | PART |
Jim Page
|
|
|
Level 4 hydrostatic test complete. Rough to cover for overhead fire sprinkler piping associated with trash shoot on level 3 complete, approved for cover.
|
INSP-Sprinkler Rough-in/Hydro | 10/4/2017 | 10/5/2017 | 10/4/2017 | A | CANC |
Jim Page
|
|
|
4th floor Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|
INSP-Sprinkler Rough-in/Hydro | 9/20/2017 | 9/21/2017 | 9/21/2017 | A | PART |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping on level 5 complete.
|
INSP-Sprinkler Rough-in | 9/19/2017 | 9/20/2017 | 9/20/2017 | A | PART |
Jim Page
|
|
|
Rough to cover inspection for trash shoots on levels 5 and 7 complete, approved for cover. Inspection for remaining overhead fire sprinkler piping on level 5 complete, level 5 approved for cover.
|
INSP-Sprinkler Rough-in/Hydro | 9/18/2017 | 9/19/2017 | 9/20/2017 | A | PART |
Jim Page
|
|
|
Rough to cover inspection for level 6 complete, level 6 approved for cover. Hydrostatic test for all of level 6 complete.
|
INSP-Sprinkler Rough-in/Hydro | 9/8/2017 | 9/11/2017 | 9/11/2017 | A | PART |
Jim Page
|
|
|
Fire pump start up complete, due to the length and amount of fire hose required to prevent erosion from the fire pump test the gallons per minute could not be reached (approximatly 700 feet of fire hose was required to be used due to road removal on the east side of building by the fire pump room, heavy equipment operations and no close place for water containment without severe soil wash-out issues near the building.). Fire pump flow test will be completed on another day.
|
INSP-Sprinkler Rough-in/Hydro | 9/8/2017 | 9/11/2017 | 9/11/2017 | A | PART |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping on level 7 complete.
|
INSP-Sprinkler Rough-in/Hydro | 8/29/2017 | 8/30/2017 | 8/30/2017 | A | PART |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping located on level 6 A side (East of fire doors) complete.
|
INSP-Sprinkler Rough-in/Hydro | 8/29/2017 | 8/29/2017 | 8/29/2017 | P | DONE |
Jim Page
|
|
|
Rough to cover inspection for remaining overhead fire sprinkler piping/pendant heads on A side level 6 complete, approved for cover.
|
INSP-Sprinkler Rough-in/Hydro | 8/29/2017 | 8/29/2017 | 8/29/2017 | P | CANC |
Jim Page
|
|
|
Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|
INSP-Sprinkler Rough-in | 6/13/2017 | 6/13/2017 | 6/13/2017 | P | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping located above hardlids in the B side 7th floor complete (west wing) hardlids approved for cover.
|
INSP-Sprinkler Rough-in | 6/1/2017 | 6/1/2017 | 6/1/2017 | P | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping on level 7 A wing (east wing) complete, approved for cover.
|
INSP-Sprinkler Rough-in | 5/15/2017 | 5/17/2017 | 5/17/2017 | A | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping located above hardlids in the B side 3rd-6th floors complete (west wing) hardlids approved for cover.
|
INSP-Sprinkler Rough-in | 5/10/2017 | 5/10/2017 | 5/10/2017 | P | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping located above hardlids on east wing complete, levels 3, 4, 5 and 6, all hardlids on noted levels for east wing approved for cover.
|
INSP-Conference | 3/2/2017 | 3/2/2017 | 3/2/2017 | A | DONE |
Jim Page
|
|
|
Temporary standpipe is in place, located on the south side (Myrtle is the access street for FDC connection) of building.
|