INSP-Final Inspection | 8/8/2016 | 8/9/2016 | 8/9/2016 | P | PASS |
Jim Page
|
|
|
Final commercial hood fire suppression system inspection passed/complete.
|
INSP-Conference | 7/8/2016 | 7/12/2016 | 7/12/2016 | A | DONE |
Jim Page
|
|
|
Fire conference complete, testing cannot be done on hood suppression system until integration with commercial hood to fire alarm system is complete. Fuel source needs to be active at time of inspection to verify energy source isolation during inspection of hood suppression activation.
|