Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberFIR16-00319
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 2153 E RIVERWALK DR
Project NameLibrary! @ Bown Crossing
Customer Number 
ePlanReviewYes
Description
[Library Bown Crossing]
The fire sprinkler scope of work consists of a one level building with a wet and dry system. The dry system protects the outside canopies. The dry system piping is galvanized and run on the roof. The 6” underground supplies a 4” backflow preventer and header.

The underground piping is under permit FIR16-00031

Plan Mod #1 – 9/19/2016

• FP-2: Routing has changed for the dry system running on the roof deck. This change has been made to insure the pipe would not be visible from the ground.
• FP-2: Sprinkler protection has been removed from the portion of the exterior overhang from a steel beam to the edge of the roof. This portion of the overhang is 4’-0” or less.
• FP-2: The dry system main supplying the East overhang has been relocated to the roof in the area of the high bay between columns 4 and 5. All pipe exposed outside is galvanized.
• FP-2: The sprinkler pipe serving the sprinklers in the high bay area between columns 4 and 5 have been redesigned at the request of the architect to better comply with the design intent of the building.
• FP-2: The SPRINKLERS outside the riser room are under a noncombustible exterior projection and are not required by NFPA 13 therefore have been removed.
• FP-2: The FDC location has been slightly revised closer to the hydrant to a location preferred by the architect.

A NEW 16,000 SF LIBRARY FOR THE CITY OF BOISE IS COMPRISED OF THREE PARTS, INCLUDING A 5,020 SF LOBBY AND MEETING AREA, A 7,390 SF READING ROOM, AND A 3,590 SF STAFF AREA. THE LOBBY AND MEETING AREA INCLUDES THE LOBBY, PUBLIC RESTROOMS, A MEETING ROOM, MULTIPURPOSE MEETING ROOM, STUDY AREAS, AND A BOOK DROP ROOM. THE READING ROOM INCLUDES A CHILDREN'S AREA, AN ADULT LOUNGE AREA, BOOK STACKS, AND A CIRCULATION DESK. THE STAFF AREA INCLUDES OPEN OFFICE AREA, BOOK HANDLING AREA, PRIVATE OFFICE, STORAGE ROOMS, STAFF BATHROOMS, MECHANICAL AND ELECTRICAL ROOM, JANITORS CLOSETS,AND A STAFF BREAK ROOM. NOTE: This building to meet LEED V4.0, Silver – New Construction & Major Renovations certification. NOTE: This building requires building commissioning. A Preoccupancy Commissioning Report shall be submitted and accepted by the Building Official prior to issuance of the Certificate of Occupancy
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/28/20175/2/20175/2/2017APASS
DetailsJim Page
Final fire sprinkler inspection passed/complete
INSP-Sprinkler Rough-in/Hydro4/21/20174/21/20174/21/2017PPASS
DetailsJim Page
Hydrostatic test for all overhead fire sprinkler piping complete
INSP-Sprinkler Rough-in3/27/20173/27/20173/27/2017PPASS
DetailsJim Page
Rough to cover inspection complete for overhead fire sprinkler piping, all area's approved for cover.
INSP-Sprinkler Rough-in3/20/20173/20/20173/20/2017PPART
DetailsTroy Cobbley
Okay to cover three wet system areas inspected, as indicated in green on the apporved plans.
INSP-Sprinkler Rough-in/Hydro3/1/20173/1/20173/1/2017PPASS
DetailsJim Page
Hydrostatic test on dry system complete.
INSP-Sprinkler Rough-in2/13/20172/13/20172/13/2017PPART
DetailsJim Page
Notated city approved area's with yellow highlighter/red ink area's approved for cover.
INSP-Sprinkler Rough-in2/10/20172/10/20172/10/2017PCANC
DetailsJim Page
Request is rescheduled for 13FEB2017
INSP-Supply line flush8/30/20168/31/20168/31/2016ADONE
DetailsJim Page
Undergroud main line flush complete