INSP-Final Inspection | 12/29/2016 | 12/30/2016 | 12/30/2016 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 12/20/2016 | 12/21/2016 | 12/21/2016 | A | FAIL |
Troy Cobbley
|
|
|
As-builts still do not match
|
INSP-Final Inspection | 12/13/2016 | 12/13/2016 | 12/13/2016 | P | FAIL |
Troy Cobbley
|
|
|
Todays inspection was just to verify as-builts. As-builts still do not match the installation
|
INSP-Final Inspection | 12/2/2016 | 12/2/2016 | 12/2/2016 | P | FAIL |
Troy Cobbley
|
|
|
Todays inspection was to verify that the as-builts match the installation. They don't. They will need to be re-submitted.
|
INSP-Final Inspection | 11/29/2016 | 11/30/2016 | 11/30/2016 | P | CANC |
Troy Cobbley
|
|
|
The as-build plans for this building have not been submitted and approved yet.
|
INSP-Final Inspection | 11/29/2016 | 11/29/2016 | 11/29/2016 | P | CANC |
Troy Cobbley
|
|
|
Rescheduled for tomorrow as previously discussed. calvin Phone #: ###-####
|
INSP-Final Inspection | 11/28/2016 | 11/29/2016 | 11/29/2016 | A | PART |
Troy Cobbley
|
|
|
Sprinkler work complete in apartments 101, 102, 201, 202, 301, 302.
|
INSP-Final Inspection | 11/16/2016 | 11/17/2016 | 11/17/2016 | A | FAIL |
Troy Cobbley
|
|
|
Contractor did not arrive for inspection. I notified them that the plan changes still had not been addressed as noted in a previous inspection
|
INSP-Sprinkler Rough-in/Hydro | 9/6/2016 | 9/7/2016 | 9/7/2016 | A | PASS |
Troy Cobbley
|
|
|
Overhead hydro of all three floors passed.
|
INSP-Sprinkler Rough-in | 8/1/2016 | 8/1/2016 | 8/1/2016 | P | PASS |
Troy Cobbley
|
|
|
Rough-in and tenting passed. Piping can be covered. Contractor needs to contact plan review to verify if resubmittals are needed or just as-builts due to minor pipe routing changes and deletion of pendant heads in Bathrooms.
|