INSP-Final Inspection | 1/20/2017 | 1/23/2017 | 1/23/2017 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 11/28/2016 | 11/29/2016 | 11/29/2016 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping complete, area of work approved for cover. Hydrostatic test for new fire sprinkler piping in area of work passed/complete.
|
INSP-Sprinkler Rough-in/Hydro | 11/22/2016 | 11/23/2016 | 11/23/2016 | P | CANC |
Jim Page
|
|
|
Inspection request cancelled per conversation with Raul Munoz Phone #: ###-####, inspection will be rescheduled for a later date.
|