Information based on query as of Thursday, June 27, 2024.
Permit Information
Permit NumberFIR16-00464
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 4481 W WILLOW LN
Project NameWCA APARTMENTS
Customer NumberUDG ONLY
ePlanReviewYes
Description
[Serena House - Underground ONLY]
The fire sprinkler scope of work consists of providing a NFPA 13 system for a new transition housing building. This permit is for the underground ONLY.

[BLD16-01427] - The fire sprinkler system per NFPA 13 is used to allow dead end corridors more than 20 feet long and as required for R-2 Occupancies. To construct a 10,382 square foot building (5,355 square feet 1st story and 5,027 square feet 2nd story) to be used for transitional housing for women and children (4,492 square feet 1st story and 4,264 square feet 2nd story) and for offices (762 square feet 1st story and 719 square feet 2nd story). Work is to include concrete footings, concrete foundation, concrete slab on grade, wood stud exterior walls, interior and exterior shear walls, interior and exterior bearing walls, wood floor joists, wood roof trusses, wood sheathing for floor and roof diaphragms, asphalt shingles, wood siding, fiber cement siding, exterior windows, exterior doors, one interior stairway, one interior stairway rated like a corridor, one exterior stairway, interior fire-rated corridors, interior nonbearing walls, interior doors, millwork, and interior finishes. The restroom that serves the office area is required to be accessible to the disabled. Two sleeping rooms and their restrooms on the 1st story are required to comply as accessible units. All other sleeping rooms and their restrooms on the 1st story are required to comply as Type B sleeping units. Special Inspection required for soils, concrete, welding, wood diaphragms, and wood shear walls. Metal plate wood trusses are a deferred submittal item. New concrete steps and handrails, a new trash enclosure, and a new 250 square foot storage shed will be constructed at or near the existing “T” shaped building. The work is required to comply with the approved drawings, with the plan review report, with the structural design, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system, if provided, is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/16/201612/16/201612/16/2016PPASS
DetailsJim Page
Final underground supply inspection passed/complete
INSP-Supply line flush10/14/201610/14/201610/14/2016PDONE
DetailsJim Page
Underground flush for fire sprinkler supply complete
INSP-Supply line flush10/10/201610/11/201610/11/2016PCANC
DetailsJim Page
Supply line flush is to be scheduled for 14OCT2016 at 2PM, this request is cancelled.
INSP-Sprinkler Rough-in/Hydro10/6/201610/7/201610/7/2016APASS
DetailsJim Page
Hydrostatic test for underground fire sprinkler main supply complete.
INSP-Sprinkler Rough-in/Hydro9/1/20169/1/20169/1/2016PPASS
DetailsJim Page
Rough to cover inspection complete for underground supply and remote FDC locations, underground supply and remote FDC approved for cover.
INSP-Sprinkler Rough-in8/31/20168/31/20168/31/2016PPART
DetailsJim Page
Partial rough to cover inspection for underground complete, approved to cover from the supplied service to the remote FDC, remaining underground will be inspected 01SEPT2016.