Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberFIR16-00658
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 1488 N ALLUMBAUGH ST
Project NameAberdeen Phase 5 Bldg #1
Customer NumberUDG ONLY
ePlanReviewYes
Description
[Aberdeen Phase 5 Building #1 - Udg Only] - Quick Permit
Install a new 2" x 85'± dedicated fire line into the new 4-Plex per NFPA 13R and the City of Boise. This is only for the UG line.

[BLD16-02646] - Permit to construct a new four plex multi-family building with each unit being 1,037 sq. ft.. All unit within this building are two story units with wood framed construction to be constructed per the approved plans and any notations. This building is on its own parcel. This building is to be fully fire sprinklered with an NFPA 13R system.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/4/20174/5/20174/5/2017APASS
DetailsTroy Cobbley
Permit finaled
INSP-Supply line flush2/21/20172/22/20172/22/2017ADONE
DetailsJim Page
Underground main supply flush complete
INSP-Sprinkler Rough-in10/18/201610/19/201610/19/2016APASS
DetailsTroy Cobbley
The underground supply piping is ok to cover
INSP-Sprinkler Rough-in10/18/201610/18/201610/18/2016PFAIL
DetailsTroy Cobbley
Per on site discussion it appears that the min. bury depth has not been met. Piping can not be buried.

Pat-underground Phone #: ###-####