INSP-Final Inspection | 6/1/2017 | 6/2/2017 | 6/2/2017 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete
|
INSP-Final Inspection | 5/31/2017 | 6/1/2017 | 6/1/2017 | A | CANC |
Jim Page
|
|
|
Project not ready for inspection, inspection request rescheduled for 02JUNE2017
|
INSP-Final Inspection | 5/31/2017 | 5/31/2017 | 5/31/2017 | P | CANC |
Troy Cobbley
|
|
|
Selonoid has not been installed yet.
Call Anthony when heading out. Thanks. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Final Inspection | 4/7/2017 | 4/7/2017 | 4/7/2017 | A | FAIL |
Troy Cobbley
|
|
|
Smoke alarm still needs to be relocated. Lawn sprinkler system needs to be installed so that auto shutdown can be verified as per the approved plans.
|
INSP-Final Inspection | 4/3/2017 | 4/3/2017 | 4/3/2017 | P | FAIL |
Jim Page
|
|
|
Decorative ceiling beams have been installed in west side of kitchen/dining area and master bedroom, deflector position is to close to beams as specified in Table 8.2.5.4.2 of NFPA13D, corrections for mentioned area's will need to be made to pass final inspection. Smoke detector in south east bedroom is to close to sprinkler head, correction will need to be made to pass final inspection. Fire sprinkler head in hallway is painted as well as east sprinkler head in south east bedroom, mentioned heads will need to be replaced for final inspection. Fire bell is not installed on exterior of house. Escutcheons need to be installed for final inspection.
|
INSP-Sprinkler Rough-in | 1/24/2017 | 1/25/2017 | 1/25/2017 | A | PASS |
Troy Cobbley
|
|
|
Tenting Inspection passed. Piping can be covered.
|
INSP-Sprinkler Rough-in | 1/23/2017 | 1/24/2017 | 1/24/2017 | A | FAIL |
Jim Page
|
|
|
Numerous area's the insulation will not sit on the sheetrock to provide the needed pocket for heat transfer due to elecrtical wiring. House has several ceiling elevation changes where the fire sprinkler piping is located in the wall, all fire sprinkler piping needs to have a clear pocket between sheetrock and heated area for freeze protection, all vertical piping is covered by blow in insulation not providing the needed pocket. Small section of pipe in southside bedroom has exposed piping to attic space, piping needs to have tenting insulation installed over piping. Overhead fire sprinkler piping cannot be covered until this is repaired.
|
INSP-Sprinkler Rough-in | 1/20/2017 | 1/23/2017 | 1/23/2017 | A | CANC |
Katie Marron
|
|
|
Unable to get to inspection due to weather.
|
INSP-Sprinkler Rough-in/Hydro | 1/11/2017 | 1/12/2017 | 1/12/2017 | P | PART |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping complete. Rough in inspection complete for overhead fire sprinkler piping, tenting insulation still needs to be installed, piping cannot be covered until tenting is complete and passed inspection.
|