INSP-Final Inspection | 1/16/2018 | 1/22/2018 | 1/22/2018 | P | PASS |
Jim Page
|
|
|
Final inspection complete.
|
INSP-Sprinkler Rough-in/Hydro | 6/1/2017 | 6/1/2017 | 6/1/2017 | P | PASS |
Jim Page
|
|
|
Notes for fire sprinkler inspections were recorded under FIR16-00741, rough to cover inspection has been completed for underground, overhead fire sprinkler piping/tenting, main line flush is complete, overhead fire sprinkler piping hydrostatic test complete.
|
INSP-Sprinkler Rough-in | 11/17/2016 | 11/18/2016 | 11/18/2016 | A | PASS |
Troy Cobbley
|
|
|
Underground supply piping is ok for cover.
|