INSP-Final Inspection | 1/16/2018 | 1/22/2018 | 1/22/2018 | P | PASS |
Jim Page
|
|
|
Final inspection complete.
|
INSP-Sprinkler Rough-in | 6/1/2017 | 6/1/2017 | 6/1/2017 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for underground complete (07DEC2016) as well as main line flush was complete (10MAY2017). Notes were recorded under FIR16-00743.
|
INSP-Sprinkler Rough-in/Hydro | 5/3/2017 | 5/3/2017 | 5/3/2017 | P | PASS |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping complete. Rough to cover inspection for overhead fire sprinkler piping/tenting complete, approved for cover.
|