INSP-Final Inspection | 1/16/2018 | 1/22/2018 | 1/22/2018 | P | PASS |
Jim Page
|
|
|
Final inspection complete.
|
INSP-Sprinkler Rough-in/Hydro | 10/4/2017 | 10/5/2017 | 10/5/2017 | P | CANC |
Jim Page
|
|
|
Hydro test ;tenting inspection. Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in/Hydro | 10/3/2017 | 10/4/2017 | 10/4/2017 | P | CANC |
Jim Page
|
|
|
Inspection request cancelled per conversation with point of contact, John Phone #: ###-#### , inspection request will be rescheduled for a later date.
|
INSP-Sprinkler Rough-in | 6/1/2017 | 6/1/2017 | 6/1/2017 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for underground was completed on 26JAN2017, main line flush was completed on 19APR2017. Notes were recorded under FIR16-00770
|
INSP-Sprinkler Rough-in/Hydro | 5/31/2017 | 6/1/2017 | 6/1/2017 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection complete for overhead fire sprinkler piping/tenting complete, approved for cover. Hydrostatic test for overhead fire sprinkler piping complete.
|