INSP-Final Inspection | 5/14/2018 | 5/15/2018 | 5/15/2018 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete.
Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in/Hydro | 5/3/2018 | 5/4/2018 | 5/4/2018 | A | DONE |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed at riser provided gauge.
Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in | 1/16/2018 | 1/16/2018 | 1/16/2018 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping/tenting inspection complete, approved for cover.
|
INSP-Supply line flush | 10/23/2017 | 10/24/2017 | 10/24/2017 | A | DONE |
Jim Page
|
|
|
Underground supply flush complete.
|
INSP-Sprinkler Rough-in | 5/11/2017 | 5/12/2017 | 5/12/2017 | P | PASS |
Troy Cobbley
|
|
|
Underground cover passed. Piping can be covered
|