INSP-Final Inspection | 3/1/2018 | 3/5/2018 | 3/5/2018 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete.
|
INSP-Sprinkler Rough-in/Hydro | 8/10/2017 | 8/10/2017 | 8/10/2017 | P | PASS |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping complete.
|
INSP-Supply line flush | 7/25/2017 | 7/26/2017 | 7/26/2017 | P | DONE |
Jim Page
|
|
|
Underground main supply flush complete.
|
INSP-Sprinkler Rough-in | 6/27/2017 | 6/27/2017 | 6/27/2017 | A | PASS |
Jim Page
|
|
|
Rough to ocver inspection for overhead fire sprinkler piping/tenting complete, approved for cover.
|
INSP-Sprinkler Rough-in | 6/21/2017 | 6/23/2017 | 6/23/2017 | A | CANC |
Jim Page
|
|
|
Pipe and tenting Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|
INSP-Sprinkler Rough-in | 6/1/2017 | 6/1/2017 | 6/1/2017 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for underground supply complete
|