INSP-Final Inspection | 1/16/2018 | 1/22/2018 | 1/22/2018 | P | PASS |
Jim Page
|
|
|
Final inspection complete.
|
INSP-Sprinkler Rough-in/Hydro | 4/27/2017 | 4/27/2017 | 4/27/2017 | P | PASS |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping complete.
|
INSP-Sprinkler Rough-in | 4/27/2017 | 4/28/2017 | 4/27/2017 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping/tenting in attic space complete, all piping approved for cover.
|
INSP-Sprinkler Rough-in/Hydro | 4/24/2017 | 4/25/2017 | 4/25/2017 | P | FAIL |
Jim Page
|
|
|
Tenting will need to be adjusted/added to cover area's of exposed piping in attic space on level 2. Batting insulation will need to be installed over fire sprinkler piping installed close to eaves, concern about blow in type insulation covering sprinkler piping in attic space.
|
INSP-Supply line flush | 4/18/2017 | 4/19/2017 | 4/19/2017 | A | DONE |
Jim Page
|
|
|
Underground main supply flush complete
|